OIT Planned Maintenance: Network Upgrades

Scheduled Maintenance Report for Brown University

Completed

The scheduled maintenance has been completed.
Posted Aug 12, 2026 - 08:00 EDT

In progress

Scheduled maintenance is currently in progress. We will provide updates as necessary.
Posted Aug 12, 2026 - 05:00 EDT

Scheduled

On Wednesday, August 12, 2026, between 5:00 AM and 8:00 AM, network connectivity (including wired, wireless and VoIP) may be unavailable at the following locations while upgrades are performed:

144 Angell
154 Angell
155 Angell
164 Angell
355 Brook
68 Brown
69 Brown
79 Brown
001 Euclid
22 Benev
64 College
59 George
60 George
94 George
102 George
128 George
1 Prospect
10 Prospect
20 Prospect
21 Prospect
168 Thayer
180 Thayer
190 Thayer
201 Thayer
71 Waterman
75 Waterman
79 Waterman
83 Waterman
85 Waterman
Posted Aug 11, 2026 - 15:47 EDT
This scheduled maintenance affected: Network Connectivity and Telecommunications (Telephone service (local and long distance), Wired Network, Wireless network (Brown, Brown-Guest, & Eduroam)).